Detained in port: waiting and preparations

Detained in port: waiting and preparations

Mission report 5 – 2025 (21.6.-12.7.2025) Detained in port: waiting and preparations The crew met in Porto Empedocle – on our motorsailer NADIR, which was still moored at the time. We used the time during which we were not allowed to set sail and therefore...
Operation Report 3

Operation Report 3

Operation Report 3 – 2025 (03/05/25 – 22/05/25) Written by Ingo Werth, Skipper  Like every operation, the third of this year began at our home port to carry out final repairs, take on provisions, and familiarise the crew with the NADIR and all safety protocols.   ...